Connect with us

Hi, what are you looking for?

Irving Weekly Title

Coppell, Texas News

S MacArthur Blvd at S Belt Line Rd Intersection to Close September 15-18 Due to DART Construction

Construction operations for the DART Silver Line are ongoing, and MacArthur Boulevard will be fully closed from 6 am on Friday, September 15 to 3 pm on Monday, September 18 to allow DART crews to perform work at the railroad crossing. Both north- and southbound traffic will be detoured around the construction zone, and motorists should utilize Mockingbird Lane, Riverchase Drive, and Fairway Drive.  

Residents and businesses in this area should expect to hear construction activity during the following work hours:

  • Friday, September 15: 6 am – 9 pm
  • Saturday, September 16: 7 am – 9 pm
  • Sunday, September 17: 7 am – 9 pm
  • Monday, September 18: 6 am – 3 pm 

Increased traffic is expected at this intersection during the full road closure. Please avoid the area and utilize an alternate route. 

For more information about the DART Silver Line, visit dart.org/silverline.

You May Also Like